Process for producing wet rooms, in particular bathrooms

Verfahren zur Herstellung von Naßräumen, insbesondere von Badezimmern

Abstract

During the production of a bathroom, the floor covering (5, 6) is laid out ready before at least some of the walls of the bathroom are erected. Here, an edge region (6) of the floor covering is guided upwards along one edge of a foot element (4) mounted previously on the floor (1), preferably on a panel material (3) which is provided on the floor (1) and forms a planar and stable underlying surface for the floor covering (5). When the floor covering (5, 6) is laid out ready, the walls of the bathroom, which may, if appropriate, comprise prefabricated wall elements (7), are erected. <IMAGE>

Claims

Description

Topics

Download Full PDF Version (Non-Commercial Use)

Patent Citations (2)

    Publication numberPublication dateAssigneeTitle
    DE-2552571-A1June 02, 1977Wolfgang GuentherBodenbeschichtung und eckenabdichtung fuer nassraeume
    DE-3440545-A1May 15, 1986Frank Dipl Ing HusterRahmenkonstruktion fuer bodenwannen und wandverkleidungen

NO-Patent Citations (0)

    Title

Cited By (2)

    Publication numberPublication dateAssigneeTitle
    DE-10018862-A1October 18, 2001Birco Baustoffwerk Gmbh, Stelcon Ag, Asendorf Bauchemie Consult GmbBelaganordnung
    DE-9416002-U1December 01, 1994Viesmann Hans Dr DrKühl- und Frischhaltezelle